We re-read the program's solar page and its October 2025 requirements on October 3, 2026. The rebate comes with conditions that change how the system is designed, so read them before you ask for quotes.
Solar panels
Paid on installed DC capacity, capped at 50% of eligible costs. Rooftop systems only, including a garage roof on the same meter.
Battery storage
Only with a new solar system, also capped at 50% of eligible costs. Combined solar and battery rebates reach $10,000.
Rebate or net metering: pick one
Take the rebate and the system must be sized for your own use, with no credit for power sent to the grid. Choose net metering and you get no rebate. The notes below show the government's payback numbers.
Approvals before you buy
The contractor files the pre-installation application with a quote dated within 60 days. You cannot buy or install before IESO pre-approval and your local utility's approval.
Finish within 12 months
The project must be complete within 12 months of approval, with the ESA certificate and the connection agreement filed within 30 days of installation.
First-time installs only
Homes that already have solar or storage are not eligible. Leases, rentals and lease-to-own arrangements are excluded.
The requirements document gives no end date for this stream, and funding conditions can change, so confirm on the program page before you sign. The IESO has no pre-qualified contractor list for it.
Rebate or net metering? In Timmins you can only pick one
The Toronto Star reported on November 1, 2026 on the Ministry of Energy's own analysis. It found a payback of 30 to 40 years for solar on the rebate path, against 23 to 29 years with net metering and no rebate. The same report says only 339 people have received a solar or battery rebate since January 2025, and installers say most customers turn it down.
That is one analysis, not a promise for your house. Your roof, your daytime use and the quote decide your result. So ask every installer for both paybacks in writing, side by side, before you sign. Our guide has the full table and the questions to ask: Ontario solar: take the $10,000 rebate or sell power to the grid?
Hydro One
Hydro One is the distribution company. It approves the connection, and the contractor files the generation connection application. Ask Hydro One about the connection process and the maximum capacity.
Lower sun, higher cost per kWh
With about 3.43 peak sun hours a day, a Timmins system produces less per kW than one in southern Ontario. The rebate is $1,000 per kW capped at half the cost, so the payback depends on your use and installed cost, which the program does not guarantee.
Housing
72% of households live in homes built before 1981 and 8.0% report needing major repairs, the highest share in our data. Check the roof first.
What counts as a cost
The rebate is capped at 50% of eligible costs, which cover equipment, permits, approvals and labour. HST, financing costs, insurance, maintenance and spare parts are not eligible costs. A quote should therefore show the pre-HST price and separate any financing, so the program can check that $1,000 per kW does not exceed half.
Timing of the project
The order matters. The contractor submits the pre-installation application with a quote dated within 60 days, you receive written pre-approval and your utility's approval, and only then do you buy and install. The system must be finished within 12 months of approval, and the contractor files the post-installation application within 30 days of installation.
No leases or financing arrangements
Rental, leasing and lease-to-own solar arrangements are not eligible for the rebate, and the system must be new, owned by you and bought in Canada. If you pay with a loan, the rebate still applies, but the interest is not an eligible cost.
How to claim in Timmins
- Confirm you own an eligible house type with a roof or garage that suits panels.
- Talk to Hydro One about the connection process and the maximum system size allowed before you sign anything.
- Choose a licensed electrical contractor and ask for a quote that shows the DC capacity in kW and the eligible costs without HST.
- Let the contractor file the pre-installation application, and wait for written IESO pre-approval and utility approval before buying or installing.
- After the install, check that the post-installation application is filed within 30 days with the ESA certificate and connection agreement.
Common questions
Is there less sun in Timmins?
About 3.43 peak sun hours a day in our data.
Who is the utility?
Hydro One.
Should I check the roof?
Yes.
Is net metering allowed?
Not with the rebate.
What to do next
See Timmins insulation rebates, heat pump rebates and the Ontario rebate calculator.
By Sam Menard. Sources, last read November 1, 2026: Home Renovation Savings: solar and battery, Solar and Storage stream requirements (PDF), Save on Energy: Home Renovation Savings, Statistics Canada 2021 Census, table 98-10-0233-01. All Timmins rebates → Every Home Renovation Savings rebate → Rebate or net metering? →